Knowable November 6, 2015 / F1 and F2
The original public call
This packet does not justify a citywide assurance that the water is safe.
Three dated results at one residence, not three independent households and not a citywide prevalence estimate. The October 21 EPA report addresses three residences overall. F1, October 21, 2015, printed page 11, Appendix B.
| Sample date | Lead | Source |
|---|---|---|
| February 18, 2015 | 104 µg/L | F1, printed page 11 |
| March 3, 2015 | 397 µg/L | F1, printed page 11 |
| April 2, 2015 | 707 µg/L* | F1, printed page 11 |
* The source row has an asterisk; this packet does not explain it. Minimum 104 µg/L; maximum 707 µg/L; spread 603 µg/L. These are not a representative sample.
Observed and recommended: The November 4 transmittal reports a switch back and filters provided, while additional corrosion control treatment "will be implemented." It recommends notice when work may disturb lead service lines. The report asks for representative sequential sampling across common plumbing materials. F1, November 4 memorandum, PDF page 1; report printed pages 6-7.
Institutional plan: The October 16 task force release promises technical assistance on reconnection and optimized corrosion control, not proof of achieved systemwide safety. F2, October 16, 2015, technical assistance excerpt.
Public action requested: Recommend advance notice near planned service-line work and request privacy-safe, representative sequential sampling and publication of methods and aggregate results. Ask community partners to review translation and accessibility before authorized publication; refer urgent exposure or treatment questions to responsible authorities. Citywide distribution and intervention effects remain unknown. F1, printed pages 6-7.